The wiring sequence of the electrical control cabinet is as follows: after everything is ready, the wiring is carried out according to the schematic diagram. First, the wiring of the main circuit should be completed, and then the control circuit and signal line should be connected successively. Pay-off, pay-off time should be carried out according to the actual need of the length, activity harness to consider the ji limit position need length, pay-off time should try to use a short wire head, avoid causing waste phenomenon; There can be no joint in the middle of the secondary wire, strong tensile wire and insulation is destroyed, the arrangement of wires to minimize bending and crossing, bending of the bending radius to control, complete the arc, wire crossing, some wire will cross the wire, generally will be placed on the fine wire, wiring each wire to straighten, Do straight and neat, beautiful style, otherwise it will look messy. When the wire passes through the metal plate hole, the metal plate hole should be covered with protective things, such as rubber guard, and can be wound in segments, winding should be neat. The pressing of the wiring head, wire received the wiring head and wiring external components, close the circuit breaker, check whether each line can work normally, if you can carry out the next process.
Previous:Cause of dust collector bag clogging failure and solution suggestion
next:Already the last article